top of page
Search

RfP: Treating wastewater from cheese production

(Status: 10.7.2022)

We have received a Request for Proposal (RfP) for the turn-key provision of a wastewater treatment plant treating wastewater from a cheese production facility in the middle of Vietnam.

The wastewater volume is appr. 100 m³/day (tbc). COD concentrations are up to 100.000 mg/l.

Details can be found in the attachment.

Please get in touch if you can provide a solution.




 
 
 

Recent Posts

See All
CALL FOR PROPOSAL- IUCN- RAS model

IUCN Viet Nam hereby invites proposals from qualified suppliers to provide equipment and set up Recirculating Aquaculture System (RAS)...

 
 
 

Comments


  • Facebook
  • LinkedIn
  • YouTube

Head Office

water:hub South-East Asia

c/o Water Solutions South-East Asia 

 

The Verosa Park, 39 Đường số 10, Khu phố 2, Phường Phú Hữu, Thành phố Thủ Đức, TP Hồ Chí Minh, Vietnam. 

Cambodia Office
c/o WaterNex Engineering
 

No. 1, Hun Sen Blvd (Street 60m), Chak Angre Kroum, Khan Meanchey, Phnom Penh, Cambodia.

 

For inquiries 

trang.ng@watersolutionssea.com

+84 (0) 969 160 988

bottom of page