PROJECTS
Find below exemplary projects carried out by our members, demonstrating their experiences in the region and their scope of services.
STRABAG
DWTP DUONG RIVER (VIETNAM)
Completion of Phase 1 of Drinking Water Treatment Plant (Phase 1-B) / 200.000 m3/d
Services provided: Engineering, detailed design as well as supply and installation of electrical and mechanical equipment, testing and commissioning
Client: AOne Deutschland AG
Location: Hanoi / Vietnam
Funding: Private Funds
Execution period: 2019
Water Solutions South-East Asia Co. ltd
IMPROVEMENT OF WASTEWATER DISPOSAL AND SOLID WASTE MANAGEMENT IN PROVINCIAL TOWNS, NORTH II PROGRAM UNDER GERMAN FINANCIAL CO-OPERATION WITH THE SOCIALIST REPUBLIC OF VIETNAM.
Services provided: Preparation and delivery of comprehensive training courses on wastewater management
Client: Tractebel GKW GmbH
Location: Son La, Lang Son, Hoa Binh / Vietnam
Funding: KfW (German Development Bank)
Execution period: since 2020
ATB Water GmbH
DINH VU INDUSTRIAL ZONE WASTEWATER TREATMENT PLANT
Services provided: Engineering, detailed design as well as supply and installation of electrical and mechanical equipment, testing and commissioning
Client: Dinh Vu IZ
Location: Hai Phong, Vietnam
Funding: Private
Execution period: 2007-2008
HST Systemtechnik GmbH & Co. KG
INTEGRATED WASTEWATER CONCEPT FOR INDUSTRIAL ZONES USING THE EXAMPLE OF TRA NOC IN VIETNAM II THE JOIN PROJECT IS SPONSORED BY GERMAN FEDERAL MINISTRY OF EDUCATION AND RESEARCH (BMBF) AND THE MINISTRY OF SCIENCE AND TECHNOLOGY OF THE SOCIAL REPUBLIC OF VIETNAM (MOST)
Services provided: Development and testing of an integrated wastewater concept for industrial zones (IZ) in Vietnam and other developing and emerging countries using the example of the IZ Tra Noc. Selection and adaptation of suitable technologies for industrial wastewater pretreatment in a container test facility under the specific conditions on site
Client: TST Can Tho (Thuoc sat trung Can Tho)
Location: Can Tho / Vietnam
Funding: BMBF (Federal Ministry of Education and Research)
Execution period: 2009-2015
HST Systemtechnik GmbH & Co. KG
SINGAPORE ABC PROJECT
ASA_WEIR FOR LEVEL CONTROL OF OPEN RAINWATER CHANNELS
Services provided:
Design / Manufacturing / Installation of:
-
Complete System for Management Rainwater Drainage (Mechanical- and Electrical-)
-
Design and Implementation of Automation System with Data Transfer to Central Head Station at PUB Technical Head Office
-
Installation Supervising Services and Commissioning
Client: Singapore’s National Water Agency (PUB)
Location: Singapore
Funding: Singapore’s National Water Agency (PUB)
Execution period: 2014 – 2018
Grundfos
Tam Thang Reused Wastewater Plant
Owner: Công ty Cổ phần Giải pháp công nghệ tái tạo - REUSE TECHNOLOGIES SOLUTIONS JSC (“RTS”)
Location: Tam Thang Industrial Park, Tam Thang village, Tam Ky ward, Quang Nam province
Scale:
-
2 Phases with total area 2.4 hectares
-
Total capacity 26.000m3/day: Phase 1 (in operation since the end of 2018) – 13.000m3/day & Phase 2 - 13.000m3/day