Request for Proposal / Wastewater Treatment plant 4500 m³/ day in 3 phases

(Status: 20.11.2020)

We have received a RfP for a wastewater treatment project in BAC TIEN PHONG INDUSTRIAL ZONE / Haiphong City. The project will be divided into 3 phases, with a first phase of 300 m³/day using nature-based solutions. We are in contact with the client for a long time already. The RfP is based on a first proposal from WSS.

Refer to the attachment for additional information, or contact f.pogade@watersolutions-int.org.


WS. BID INVITATION
.pdf
Download PDF • 1.08MB

4 views0 comments

Recent Posts

See All

New Law on Environmental Protection (Vietnam)

(Status as of 22.12.2020) We would like to share with you the Law on Environmental Protection 2020 (amendment) which was published last week. The law was approved by National Assembly on 17/11/2020 an