Request for Proposal / Wastewater Treatment plant 4500 m³/ day in 3 phases

(Status: 20.11.2020)

We have received a RfP for a wastewater treatment project in BAC TIEN PHONG INDUSTRIAL ZONE / Haiphong City. The project will be divided into 3 phases, with a first phase of 300 m³/day using nature-based solutions. We are in contact with the client for a long time already. The RfP is based on a first proposal from WSS.

Refer to the attachment for additional information, or contact f.pogade@watersolutions-int.org.


WS. BID INVITATION
.pdf
Download PDF • 1.08MB

7 views0 comments

Recent Posts

See All

Status: 28.12.2022 Vinh Hoa – Ben Tre Water Plant (supplying water for communes in Cho Lach District, Mo Cay Bac District, etc.) Location: Vinh Hoa, Ben Tre. 20km from Ben Tre city Total design capaci