(Status: 25.2.2022)
We have received a request for a proposal for a wastewater treatment plant with the capacity of 2,500 cbm per day (EPC). The wastewater is generated from a rubber production process. The contractor for the civil works has to be a Vietnamese company.
For details as available at the moment, refer to the attachment.
WSS Data Aquisition WWTP
.docx
Download DOCX • 184KB